High level glass replacement case study

5.5m canopy glass unit replaced at The Stage

LDM Installers replaced a 5.5m long canopy glass unit weighing 616kg at The Stage in Shoreditch for Rhodium. The unit was lifted by city crane on a Hydraulica Dual Circuit vacuum lifter.

City craneDual circuit vacuum lifterLarge format
5.5m canopy glass unit on a vacuum lifter being lifted by city crane outside The Stage, Shoreditch
The 5.5m canopy unit on the vacuum lifter, lifted by city crane outside The Stage.

The job at a glance

Client
Rhodium
Building
The Stage, Shoreditch, London EC2
Glass
1 canopy unit, 5.5m long, 616kg
Lifting
City crane with Hydraulica Dual Circuit vacuum lifter
Result
Canopy unit replaced by crane from street level

How the job ran

The canopy sits above the entrance, so the new unit had to be lifted in from the street.

A city crane carried the 616kg unit flat on a Hydraulica Dual Circuit vacuum lifter and placed it into the canopy.

A dual circuit lifter has 2 independent vacuum circuits, so the glass stays held if one of them fails. That matters most when the glass is travelling overhead.

Planning a similar replacement?

LDM covers the survey, the make safe, the glass procurement and the installation. Send us photos of the unit and the building and we'll tell you how we'd reach it.