High level glass replacement case study
Glass doors and a facade panel replaced by BMU at The Bard
LDM Installers replaced 2 glass doors, each 3m tall, and a facade glass panel at The Bard in London for CBRE. Access was from the building's own BMU, with the glass handled on a DSZ2 vacuum lifter.
The job at a glance
- Client
- CBRE
- Building
- The Bard, London
- Glass
- 2 doors, each 3m tall, and 1 facade panel
- Access
- The building's own BMU
- Lifting
- DSZ2 vacuum lifter
- Result
- Doors and facade panel replaced from the BMU
How the job ran
The doors open onto a terrace on an upper floor, so the glass had to travel up the outside of the building.
The building's own BMU gave us the access. Our SAEMA-trained operators ran the cradle, and each unit was carried and positioned with a DSZ2 vacuum lifter.
Planning a similar replacement?
LDM covers the survey, the make safe, the glass procurement and the installation. Send us photos of the unit and the building and we'll tell you how we'd reach it.