High level glass replacement case study

791kg glass unit replaced at the Hewett Building

LDM Installers replaced a 791kg glass unit at the Hewett Building in London for JLL. The lift was made by spider crane with a Hydraulica 1000A vacuum lifter, over a weekend, with zero disruption to building operations.

Spider craneVacuum lifterWeekend works
791kg glass unit on a vacuum lifter being lifted by spider crane at the Hewett Building, London
The 791kg unit on the vacuum lifter, lifted towards the opening by spider crane.

The job at a glance

Client
JLL
Building
Hewett Building, London
Glass
1 unit, 791kg
Lifting
Spider crane with Hydraulica 1000A vacuum lifter
Working hours
Weekend
Result
Unit replaced with zero disruption to building operations

How the job ran

At 791kg the unit was far too heavy to handle by hand, so the whole job was built around the lift.

A spider crane was set up on the street in front of the facade. It carried the glass on a Hydraulica 1000A vacuum lifter while our installers guided the unit into the opening from platforms on either side.

We did the work over a weekend to keep disruption to the building to a minimum.